E3 DESIGNS COMMERCIAL PRICE SCHEDULE*
Effective January 1,, 2008

New System Commissioning (SIN 246 42) $.10 per sq. foot
Re-commissioning of Existing (SIN 246 42) $.08 per sq. foot
HVAC Life-Cycle Analysis (SIN 246 42) $.05 per sq. foot
System Monitoring and Verification (SIN 246 42) $.08 per sq. foot
Chiller Plant Optimization (SIN 246 42) $12,000 per year
Additional Consulting Services (SIN 246 42) See below

Additional consulting services will be billed on a time and material basis, including:

  • Project Management (SIN 246 42)
  • Design Engineering (SIN 246 42)
  • Consulting for energy savings programs (SIN 246 42)
  • Customized building operator training programs (SIN 246 42)
  • Performance of new system life-cycle analysis (optional service for New System Commissioning) (SIN 246 42)
  • Peer review of plans and specifications prior to bid (optional service for New System Commissioning) (SIN 246 42)

Applicable billing rate for these and any additional services beyond the scope of the above-defined services are as follows:

Senior Registered Engineer $150 per hour
Project Engineer $90 per hour
Designer $75 per hour
AutoCad Operator $55 per hour
Clerical $40 per hour

Reimbursable expenses incurred in connection with all Services will be charged on the basis of actual cost plus 20%. Reimbursable expense items typically consist of travel beyond 50 miles of our office, long distance calls, mylars, blueprints, CAD plotting, reproduction costs, Xerox, overnight mail, postage, parking fees, etc.

GSAdvantage information:
As an approved vendor on the Federal Supply Schedule our GSA Contract Number is GS07F0239N under Schedule 84, SIN 245 52. E3 Designs is HubZone Certified.

* For GSA pricing, discount the above prices by 20.8%. An additional fee of .75% will be added to the total order, which is paid directly to GSA to cover the Industrial Funding Fee (IFF).

 

 